For this full apartment renovation, our team completed a comprehensive construction-focused remodel that transformed the space from a standard layout into a modern, fully rebuilt interior. The project included full demolition, electrical and plumbing upgrades, new flooring, wall and ceiling reconstruction, and high-quality finish installation throughout all living areas.
Renovation Details
Full Demolition & Preparation
All existing finishes, wall coverings, flooring materials, and outdated fixtures were fully removed. Walls and ceilings were stripped to the base surfaces where required, allowing for proper leveling, reinforcement, and preparation for new construction systems.
Wall Reconstruction & Finishing
All walls were leveled using professional plastering systems to achieve precise geometry and smooth surfaces. New drywall partitions were installed where necessary to optimize the layout. Finished walls were prepared for painting with fine skim coats to ensure a seamless, high-quality result.
Ceiling Construction & Lighting Integration
New suspended gypsum ceilings were installed across the apartment. Linear recesses and cutouts were formed to accommodate integrated lighting systems. All ceilings were precisely leveled and finished to support recessed, pendant, and concealed LED lighting installations.
Electrical System Upgrade
The electrical system was completely rebuilt, including new wiring, breaker panel upgrades, outlets, and switches. Dedicated circuits were installed for kitchen appliances, lighting zones, and climate equipment. All electrical work complies with modern safety and load standards.
Plumbing & Bathroom Infrastructure
All plumbing lines were replaced with new supply and drainage systems. In the bathroom, new water lines, concealed shower plumbing, wall-mounted fixtures, and modern sanitary connections were installed to ensure long-term reliability and optimal water performance.
Flooring Installation
The existing flooring was fully removed and replaced with new durable flooring installed over a properly leveled subfloor. Sound-insulating underlayment was applied where required to improve acoustic comfort and overall floor stability.
Bathroom Waterproofing & Tile Work
A complete waterproofing system was applied to all wet areas, including floors and shower walls. Large-format tiles were installed with precision alignment, minimal grout lines, and moisture-resistant setting materials to ensure durability and ease of maintenance.
Kitchen Construction & Built-In Systems
The kitchen area was rebuilt with new service connections for integrated appliances, ventilation, and electrical loads. Base structures and mounting systems were installed to support custom cabinetry, island construction, and countertop installation.
Doors, Trim & Final Installation
All interior doors, baseboards, and trim elements were newly installed to match the updated floor and wall finishes. Hardware, fittings, and alignment were completed to deliver a clean, finished construction result throughout the apartment.
Final Surface Treatment & Quality Control
All painted surfaces were finished using premium interior coatings for durability and uniform appearance. The project concluded with detailed quality checks, surface cleaning, and final system testing to ensure full compliance with construction standards.
HomeByMila
Huge thank you! The flooring installation is perfect. I’m honestly impressed with the attention to detail.