We deliver interior commercial remodels designed around your business continuity. From phased work plans to spotless daily wrap-ups, every project is managed with precision and clarity—so your operations can continue safely and efficiently. Call us to discuss your project.
Our process emphasizes clean execution, controlled dust and odor, and flexible scheduling, including night or weekend shifts when needed. We coordinate with building management and landlords to ensure code compliance and smooth logistics throughout each phase.
Use Cases & Scopes
Our commercial remodeling contractors specialize in office and workplace fit-outs that balance speed, cleanliness, and business continuity. Whether it’s a second-generation space refresh or a full gut renovation, we plan each phase to minimize downtime and coordinate seamlessly with building schedules and occupants.
Healthcare and clinic interiors require extra precision—dust containment, air filtration, and routed access are integral to every plan. We collaborate with inspectors and facility managers to keep critical environments clean, compliant, and operational throughout the build.
Retail and hospitality remodels emphasize presentation and timing. We manage phased construction, storefront updates, lighting upgrades, and deliveries to keep customer areas safe and brand-ready. A “second-generation space” means a previously occupied interior adapted for a new tenant or function, unlike a warm shell, which begins as unfinished space awaiting full fit-out.
Portfolio Snapshot
A downtown office renovation required a full interior refresh while the tenant continued operations. We divided the remodel into three phases, working after-hours to replace finishes, lighting, and MEP systems. Strict dust and odor control kept shared hallways and neighboring suites unaffected, while elevator logistics ensured daily debris removal without disruption. The result — a refreshed, functional space handed over on schedule and ready for immediate occupancy.
For a retail client, we transformed a second-generation space into a modern boutique within a high-traffic building. The plan combined nighttime construction, moisture-safe painting, and controlled air circulation to maintain store operations nearby. Our team coordinated elevator and loading dock access with building management for seamless logistics. The finished result — bright interiors, energy-efficient lighting, and a layout that matched the client’s new brand image.
Our Commercial Remodeling Services
- Preconstruction planning — scope alignment, schedule strategy, and risk controls for operations continuity.
- Selective demolition & protection — clean tear-outs with dust and odor control for active buildings.
- Electrical & lighting — panel capacity, circuiting, and layered lighting suited to each occupancy.
- HVAC & ventilation — balanced airflow, filtration, and comfort in high-use interiors.
- Plumbing & wet areas — targeted runs for restrooms, pantries, and code-compliant fixtures.
- Interior finishes — durable, easy-maintain surfaces for high-traffic spaces.
- ADA & egress considerations — accessibility-aware planning integrated from design to ensure ADA compliance for renovations.
- After-hours & weekend work — phasing that minimizes disruption to daily operations, including flexible after-hours construction.
- Elevator & logistics coordination — protected routes for materials and debris removal, ensuring efficient elevator logistics.
- Closeout & punchlist — documented handoff with clear turnover standards, streamlining commercial renovation phasing.
Compliance & Building Coordination
Our process integrates ADA, egress, and local building code requirements directly into each project plan and inspection schedule. We coordinate approvals with building management and landlords to ensure every phase aligns with established building policies and regulatory expectations, avoiding delays and last-minute surprises.
All documentation, permits, and access logistics are handled with full attention to shared-space rules, noise restrictions, and operating hours. Every step — from material delivery to waste removal — follows the property’s regulations and lease agreements to maintain safety, order, and tenant relations.
Transparent Pricing & Value
The interactive pricing tool below provides a starting range based on your project scope. Final estimates are refined after our on-site walkthrough and confirmation of materials, schedule, and phasing requirements, ensuring transparency before work begins.
Key factors include the tenant improvement level (refresh or full gut), the extent of MEP upgrades, after-hours or weekend scheduling, elevator and site logistics, supplier lead times, ADA and egress compliance, and inspection coordination. We can coordinate around your TI allowance structure if applicable.
Online repair cost calculation in Coral Springs
How We Work in Active Buildings
Assessment & Plan
Each commercial renovation begins with a detailed walkthrough and risk mapping to align safety, access, and daily operations. We build an occupancy-aware schedule that protects business continuity from the start.
Protection & Access
We install dust barriers, floor protection, and clearly marked routes to maintain clean, safe circulation throughout shared spaces. Coordination with building management ensures compliant logistics and minimal disruption.
Phased & After-Hours Work
Our approach to commercial renovation phasing combines controlled night and weekend work windows with strict dust and odor management. Every stage has defined milestones to keep both progress and operations predictable.
Turnover & Support
Final delivery includes quality assurance checks, documentation, and post-completion follow-up. We fine-tune details, confirm systems operation, and support you beyond project closeout.
Materials & IAQ
We specify materials built for commercial durability — surfaces that resist wear, clean easily, and maintain slip resistance while meeting low-odor and maintenance-friendly standards. Every product is selected for longevity and operational practicality.
Indoor air quality is a constant priority: filtered ventilation, proactive air exchanges, and low-VOC finishes help maintain a healthy environment during and after construction. Existing occupied zones remain protected through continuous monitoring and containment measures.
FAQ
What is the difference between a refresh and a full tenant improvement?
A refresh updates finishes and lighting within an existing layout, typically with limited system changes and faster phasing. A full tenant improvement reconfigures space and may include electrical, HVAC, and plumbing upgrades, sequencing inspections and turnover in defined stages.
How do you minimize disruption if the business remains open?
We plan work in phases, isolate areas with dust barriers, and schedule noisy or high-impact tasks after-hours or on weekends. Clear routes, daily cleanups, and coordinated deliveries keep operations and customer access predictable.
Do interior alterations require ADA upgrades?
Many alterations trigger accessibility reviews for relevant paths, clearances, and fixtures. We integrate ADA considerations into design and permitting so compliance is addressed upfront rather than as a late change.
How are after-hours construction and elevator logistics handled?
We align work windows with building policies and secure approvals for night or weekend shifts. Elevator and loading-dock schedules are coordinated in advance, with protected routes for materials and debris to keep shared areas safe and orderly.
What shapes the schedule most in commercial remodeling?
Phasing around operations, permitting and inspections, and lead times for specified materials drive the timeline. Early selections and a confirmed sequence for trades help keep milestones on track.
What is a TI allowance and how is it typically applied?
A tenant improvement (TI) allowance is a landlord-provided budget contribution toward build-out costs. We help align scope and schedule with the allowance structure and documentation requirements set by the lease.